C I V I L  P R O J E C T 
  • Whatsapp Group

  • Site Visit/Inspection

  • 1st Preliminary Drawing

  • Meeting On 1st Preliminary Drawing & Finalization/Approval

  • Final Drawing To RCC- Design

  • Final Drawing With Column Position To 3D View

  • Finalization Of Contractor And Material Selection

  • Finalization Of Contractor And Material Selection

  • Start Of Work

  • Markout / Excavation / Footing & Column Installation / Center Line Checking / Casting / Plinth Filling

  • 3D View - Block Options

  • 1st Slab Preparation

  • 2nd Slab Preparation

  • G.F. - Brick Work

  • 3rd Slab Preparation

  • F.F. - Brick Work

  • Tower Slab Preparation

  • S.F. - Brick Work

  • Electrification Piping

  • Plumbing Working

  • Compound Wall And Parapet Wall Working

  • Plastering Interior & Exterior

  • Wall Punning & POP Framing

  • Electrification

  • Gypsum sheet Installation

  • Lighting & Fitting

  • Flooring & wall tilling Installation

  • Sanitary ware & Fitting

  • Electrification Completion

  • Fabrication (m.s. & s.s. Work)

  • Aluminium Window Work

  • Coloring (Exterior & Elevational part) (Base to Final)

  • Gardening & Landscaping Work

  • Door's Installation & Framing Work

  • Decorative & Elevational Lighting Work

  • Site / Project Completion